Deck Spring/Summer 2009
Switch to Overview
The Original Deck
The Original Railing
Original Deck Posts
Original Deck Posts in the ground
Old Deck Top of Post
Deck Post Bottom
Railings Removed
Removing Decking
Removing Joists
Rotten Sheeting
Rotten Sheeting
Deck Rot
Rotten Header
Rotten Studs
Rotten Sill Plate
Deck Rot
Temporary Beam
Beam on Lally Post
three lally posts
Lally posts on 2x6
Removing Header
Nail Remover
Nail Remover Closeup
New Header
Nailing the Header
The Last Stud Standing
Removing Studs
Just half a stud left
The New Wall
The New Wall
Insulation
Cutting insulation to size
Insulation all taped up
Sheeting
Sheeting is Done
Housewrap
Housewrap done
Ledger board temporarily nailed in
Deck Layout
Leveling Ledger Spikes
First Stake
All ledger stakes
batterboards
Engineering Control Centre
Outer Rim String
Parallel Batterboards
More layout lines
Lines not in right position
Painted Centre of post hole
trying to get square
getting square
Painted Post Holes
Crop Circles
End of Day
Day 9 digging first hole
Big foot
First Hole getting deeper
Oh oh
Oh oh closeup
bye bye Don
Don is back
First hole finished
Digging 2nd hole
Digging 2nd hole view from house
boulders
3rd hole
3 holes
preparing the holes
Measuring hole depth
Depth of hole
hitting bedrock
closeup of bedrock
41 inches deep
44 inches deep
getting the gravel
gravel boo boo
accusations
Big foot all set up
big foot in the hole
I'm fixing a hole
Terry helping out
3 filled holes
Beer Break
Last one in
extra fill
end of day 10
Switch to Overview