Deck Summer/Fall 2009
 
<< Prev                      Switch to Thumbnails                      Next    >>
  It took 2 wheelbarrow's of gravel (or 40 shovel fulls) per hole. After that, you jump in the hole, tamper it down, get out of the hole (which I wouldn't be able to do, being too short!) and place the sonatubes so that line up with the layout lines.