Deck Spring/Summer 2009
Switch to Overview
(you may have to scroll down for thumbnails until I fix this)
                                                                                       
 
Day 1 Original Deck
 
The Original Railing
 
Original Deck Posts
 
Original Deck Posts in the ground
 
Old Deck Top of Post
 
Deck Post Bottom
 
Railings Removed
 
Removing Decking
 
Removing Joists
 
Rotten Sheeting
 
Rotten Sheeting
 
Day 2 Deck Rot
 
Rotten Header
 
Rotten Studs
 
Rotten Sill Plate
 
Deck Rot
 
three lally posts
 
Day 3-4 Temporary Beam
 
Beam on Lally Post
 
Day 5 emoving Header
 
Nail Remover
 
Nail Remover Closeup
 
New Header
 
Nailing the Header
 
Day 6 The Last Stud Standing
 
Removing Studs
 
Just half a stud left
 
The New Wall
 
The New Wall
 
Day 7 Insulation
 
Cutting insulation to size
 
Insulation all taped up
 
Sheeting
 
Sheeting is Done
 
Day 8 Housewrap
 
Housewrap done
 
Ledger board temporarily nailed in
 
Day 9 Deck Layout
 
Leveling Ledger Spikes
 
First Stake
 
All ledger stakes
 
batterboards
 
Engineering Control Centre
 
Outer Rim String
 
Parallel Batterboards
 
More layout lines
 
Lines not in right position
 
Painted Centre of post hole
 
Painters Tape
 
trying to get square
 
Crop Circles
 
Big foot
 
End of Day
 
Day 10 digging first hole
 
Oh oh
 
Oh oh closeup
 
bye bye Don
 
Don is back
 
Digging 2nd hole view from house
 
boulders
 
Day 11 preparing the holes
 
getting the gravel
 
dumping gravel
 
accusations
 
Big foot all set up
 
Trimming Sonatube
 
Fitting Sonatube on bigfoot
 
big foot in the hole
 
Terry helping out
 
Backfilling
 
3 filled holes
 
Beer Break
 
extra fill
 
end of day 11
 
Day 12-13 Avoiding Hydro Lines
 
Final Holes
 
Serious Precision
 
Goodbye Don
 
Gravel
 
Backfilling
 
day 14-18 backfilling
 
Day 19-20 concrete
 
moving the bags
 
fill 'er up
 
Mixing the concrete
 
Mixing the concrete
 
concrete consistency
 
more shoveling
 
cutting rebar
 
Rebar
 
pushing in rebar
 
Pusing the rebar down
 
Rebar
 
j bolt ancher is in
 
Simpson post saddles
 
taking a break in NC
 
Ready for posts
 
sketchup
 
sizing posts
 
water level
 
cutting posts
 
Perfectly level
 
Level that way too
 
protecting pt ends
 
beam spacers
 
beam with spacers
 
beams
 
dirty clamps
 
sandwiched beams
 
beam junctures
 
rim joists
 
Joist positions
 
post flashing
 
post flashing 2
 
Swiffer asleep
 
Header
 
Joist for Header
 
Header Board
 
half of the header
 
Joists to the house
 
Joists on the header
 
hurricane ties
 
hurricane ties
 
Header is done
 
joists
 
Joists
 
ankle
 
Titan
 
Titan Blocking
 
Day 27 all the joists
 
DSCN0486
 
joists attached
 
Day 28 Caulking
 
Taping
 
Flashing Tools
 
Day 28 Slits in Flashing
 
flashing entire ledger
 
more caulking
 
Platform
 
nailing the decking
 
spacing
 
spacers
 
end spacing
 
jigs
 
chairs
 
swiffer
 
Day 29 Happy Anniversary
 
Day 30 Nathan
 
Boys & their guns
 
Boys & their guns
 
Post location
 
Day 32 Drilling Hole for Titan
 
Pounding
 
Pilot holes
 
Lag Screws
 
Drilling
 
Posts are up
 
Party Begins
 
Too many drinks
 
Day 33 railings
 
jigs
 
nailing jig
 
Placing the Railing
 
Placing the Railing
 
Day 34 Last railing
 
Day 35 Glass Rail
 
bottom rail
 
stickers on glass
 
Final glass railings
 
Day 36 Hand Rail
 
Sanding Hand Rail
 
Screwing last hand rail
 
Complete railing
 
Complete Glass Railing
Switch to Overview