Deck Part 1
Spring/Summer 2009
Switch to Overview
Day 1 Original Deck
The Original Railing
Original Deck Posts
Original Deck Posts in the ground
Old Deck Top of Post
Deck Post Bottom
Railings Removed
Removing Decking
Removing Joists
Rotten Sheeting
Rotten Sheeting
Day 2 Deck Rot
Rotten Header
Rotten Studs
Rotten Sill Plate
Deck Rot
three lally posts
Day 3-4 Temporary Beam
Beam on Lally Post
Day 5 emoving Header
Nail Remover
Nail Remover Closeup
New Header
Nailing the Header
Day 6 The Last Stud Standing
Removing Studs
Just half a stud left
The New Wall
The New Wall
Day 7 Insulation
Cutting insulation to size
Insulation all taped up
Sheeting
Sheeting is Done
Day 8 Housewrap
Housewrap done
Ledger board temporarily nailed in
Day 9 Deck Layout
Leveling Ledger Spikes
First Stake
All ledger stakes
batterboards
Engineering Control Centre
Outer Rim String
Parallel Batterboards
More layout lines
Lines not in right position
Painted Centre of post hole
Painters Tape
trying to get square
Crop Circles
Big foot
End of Day
Day 10 digging first hole
Oh oh
Oh oh closeup
bye bye Don
Don is back
Digging 2nd hole view from house
boulders
Day 11 preparing the holes
getting the gravel
dumping gravel
accusations
Big foot all set up
Trimming Sonatube
Fitting Sonatube on bigfoot
big foot in the hole
Terry helping out
Backfilling
3 filled holes
Beer Break
extra fill
end of day 11
Day 12-13 Avoiding Hydro Lines
Final Holes
Serious Precision
Goodbye Don
Gravel
day 14-18 backfilling
Day 19-20 concrete
moving the bags
fill 'er up
Mixing the concrete
Mixing the concrete
concrete consistency
more shoveling
cutting rebar
Rebar
pushing in rebar
Pusing the rebar down
Rebar
j bolt ancher is in
Simpson post saddles
taking a break in NC